WEBVTT

00:00:00.256 --> 00:00:02.219
Hi, I'm Steve Smith with Camper Van

00:00:02.219 --> 00:00:04.864
Freedom. After mounting the roof lights and

00:00:04.864 --> 00:00:06.869
cameras, I needed a route for their

00:00:06.869 --> 00:00:08.237
cables into the van.

00:00:08.281 --> 00:00:09.626
I built that route around the rack

00:00:09.646 --> 00:00:11.908
with junction boxes, P V C pipe,

00:00:11.950 --> 00:00:14.234
cable glands and a larger entry box.

00:00:14.382 --> 00:00:16.814
Four recorded sessions covered thirty-six hours of

00:00:16.814 --> 00:00:19.098
box preparation, conduit fitting,

00:00:19.118 --> 00:00:20.874
wire work and finishing.

00:00:20.964 --> 00:00:22.394
I had already worked on the rack,

00:00:22.415 --> 00:00:24.250
light plates and camera mounts.

00:00:24.335 --> 00:00:26.533
The cable route connected those equipment positions

00:00:26.681 --> 00:00:28.127
to the inside of the van.

00:00:28.249 --> 00:00:30.041
I designed the P V C arrangement

00:00:30.041 --> 00:00:32.003
in SketchUp, then worked through it as

00:00:32.003 --> 00:00:34.259
individual boxes and pipe sections.

00:00:34.508 --> 00:00:36.066
That made the front boxes,

00:00:36.087 --> 00:00:39.244
middle boxes and larger roof-entry box separate

00:00:39.244 --> 00:00:42.587
fabrication tasks instead of one finished-roof picture.

00:00:42.771 --> 00:00:44.009
At the driver-front box,

00:00:44.009 --> 00:00:46.399
I drilled openings for the light-wire entries,

00:00:46.441 --> 00:00:48.233
installed a cable gland and ran the

00:00:48.233 --> 00:00:50.281
wires through it. I also prepared the

00:00:50.281 --> 00:00:52.735
middle driver-side box with mounting bars,

00:00:52.841 --> 00:00:54.987
P V C connectors and glands.

00:00:55.126 --> 00:00:56.918
My MAKERELE gland kit appears in the

00:00:56.918 --> 00:00:58.220
materials for this work.

00:00:58.283 --> 00:01:00.374
Each gland formed a transition between an

00:01:00.374 --> 00:01:01.996
equipment lead and a box,

00:01:02.080 --> 00:01:04.342
while the pipe connections continued the route

00:01:04.342 --> 00:01:07.011
along the rack. The passenger-front section brought

00:01:07.011 --> 00:01:08.484
more of those parts together.

00:01:08.590 --> 00:01:09.807
I drilled its box,

00:01:09.913 --> 00:01:12.131
fitted threaded P V C connectors and

00:01:12.131 --> 00:01:13.923
a wire gland, and cut the pipe

00:01:13.923 --> 00:01:15.536
leading toward the larger box.

00:01:15.740 --> 00:01:17.745
The photograph of the loose components records

00:01:17.745 --> 00:01:19.623
that fitting stage before the section was

00:01:19.623 --> 00:01:22.183
complete. Metal ties attached the conduit to

00:01:22.183 --> 00:01:24.231
the extrusion, and I returned to tighten

00:01:24.231 --> 00:01:26.218
more ties as the route came together.

00:01:26.370 --> 00:01:28.887
The larger Otdorpatio project box was the

00:01:28.887 --> 00:01:31.426
meeting point for the roof-to-interior route.

00:01:31.618 --> 00:01:33.154
I made openings through the box and

00:01:33.154 --> 00:01:35.480
roof, then applied primer and white paint

00:01:35.501 --> 00:01:36.642
around the cut area.

00:01:36.843 --> 00:01:39.062
Later photographs show the wires passing through

00:01:39.062 --> 00:01:40.683
the larger box and down into the

00:01:40.683 --> 00:01:43.627
cargo area. The outside and inside views

00:01:43.627 --> 00:01:45.740
explain the same transition from two different

00:01:45.760 --> 00:01:48.644
positions. Wire identification had its own place

00:01:48.644 --> 00:01:50.692
in the sequence. I used a label

00:01:50.692 --> 00:01:52.356
maker to label a lead running into

00:01:52.356 --> 00:01:54.309
the van. I also brought the camera's

00:01:54.309 --> 00:01:56.358
Ethernet cable through a gland into a

00:01:56.358 --> 00:01:57.723
P V C tee,

00:01:57.766 --> 00:01:59.984
and routed the driver-side wires across to

00:01:59.984 --> 00:02:02.651
the larger box. During the final session,

00:02:02.715 --> 00:02:05.147
a fish-tape wire puller helped run wires

00:02:05.147 --> 00:02:06.198
through the pipe system.

00:02:06.309 --> 00:02:08.763
My photograph shows the actual reel used

00:02:08.827 --> 00:02:11.166
at that stage. The finishing work included

00:02:11.166 --> 00:02:13.043
plastic trim around the opening into the

00:02:13.043 --> 00:02:16.095
van, another gland for the passenger-side camera,

00:02:16.243 --> 00:02:18.462
the remaining P V C connections and

00:02:18.462 --> 00:02:21.086
the junction-box covers. I cemented the remaining

00:02:21.086 --> 00:02:23.156
pipe joints and tightened the metal ties.

00:02:23.262 --> 00:02:26.718
My final diary status marked this conduit-and-wire-routing

00:02:26.718 --> 00:02:29.517
project finished. The wide roof picture belongs

00:02:29.517 --> 00:02:30.819
to that closing stage,

00:02:30.839 --> 00:02:34.317
after the earlier open-box and wire-pulling photographs.

00:02:34.466 --> 00:02:36.471
Thanks for watching. I'm Steve Smith with

00:02:36.471 --> 00:02:39.672
Camper Van Freedom. This roof-cable project connected

00:02:39.779 --> 00:02:42.232
mounted devices, individual boxes,

00:02:42.296 --> 00:02:45.325
conduit, identification and the entry into the

00:02:45.325 --> 00:02:47.108
van. The complete guide,

00:02:47.193 --> 00:02:50.244
original project photographs, diary entries and materials

00:02:50.307 --> 00:02:52.036
references are linked below.

00:02:52.313 --> 00:02:53.145
Until next time.
