WEBVTT

00:00:00.256 --> 00:00:02.219
Hi, I'm Steve Smith with Camper Van

00:00:02.219 --> 00:00:05.419
Freedom. My roof-rack fitting sequence started with

00:00:05.419 --> 00:00:07.086
a rack already on the van.

00:00:07.132 --> 00:00:08.582
I moved its crossbeams,

00:00:08.582 --> 00:00:10.567
added another layer of extrusion,

00:00:10.716 --> 00:00:12.444
brought two solar panels up for fitting

00:00:12.465 --> 00:00:14.535
and made plates for the small lights.

00:00:14.726 --> 00:00:16.348
These steps were part of a twelve-hour

00:00:16.348 --> 00:00:19.323
roof-work session that also included electrical tasks.

00:00:19.482 --> 00:00:21.616
The wider project was still in progress.

00:00:21.786 --> 00:00:23.728
The existing rack was the starting point.

00:00:23.791 --> 00:00:26.394
The added twenty-twenty extrusion sat above the

00:00:26.394 --> 00:00:28.741
original rack extrusion, so those were separate

00:00:28.741 --> 00:00:30.136
layers of the arrangement.

00:00:30.164 --> 00:00:32.938
A lengthwise photograph shows their relationship across

00:00:32.938 --> 00:00:35.540
the roof. A close-up gives another kind

00:00:35.540 --> 00:00:38.271
of information: which corner bracket connects the

00:00:38.271 --> 00:00:40.669
pieces and where its fasteners sit.

00:00:40.719 --> 00:00:42.639
My numbered diary steps put moving the

00:00:42.639 --> 00:00:44.773
crossbeams first. I moved them to suit

00:00:44.773 --> 00:00:47.418
the solar-panel length, then installed extrusion above

00:00:47.418 --> 00:00:49.606
the existing rack with corner brackets.

00:00:49.788 --> 00:00:51.602
The order matters because the new pieces

00:00:51.623 --> 00:00:53.543
were being fitted to an arrangement already

00:00:53.543 --> 00:00:55.463
in place. This was a sequence of

00:00:55.463 --> 00:00:56.786
changes to the rack,

00:00:56.828 --> 00:00:58.727
rather than a photograph of loose rails

00:00:58.791 --> 00:01:01.025
laid out independently. I then brought two

00:01:01.025 --> 00:01:03.031
solar panels onto the roof for fitting.

00:01:03.201 --> 00:01:05.079
That trial position had its own place

00:01:05.079 --> 00:01:06.402
in the recorded sequence.

00:01:06.529 --> 00:01:08.941
The following step was cutting twenty-twenty extrusion

00:01:09.004 --> 00:01:10.976
to size. I keep the panel fitting

00:01:10.996 --> 00:01:13.130
separate from later electrical connections,

00:01:13.257 --> 00:01:14.836
because the diary describes what I was

00:01:14.836 --> 00:01:17.567
checking and fabricating during this particular stage

00:01:17.567 --> 00:01:19.849
of the build. The corner connections joined

00:01:19.849 --> 00:01:21.940
the added extrusion to the rack below.

00:01:22.110 --> 00:01:23.774
One photograph shows a bracket with a

00:01:23.774 --> 00:01:25.610
fastener visible on each face.

00:01:25.737 --> 00:01:27.700
The wider view places that connection among

00:01:27.700 --> 00:01:30.147
the surrounding rails. Keeping those two views

00:01:30.147 --> 00:01:32.644
together helps locate a small joint later:

00:01:32.707 --> 00:01:34.500
one explains the connection itself,

00:01:34.670 --> 00:01:36.313
and the other explains where it belongs

00:01:36.334 --> 00:01:37.486
in the roof arrangement.

00:01:37.486 --> 00:01:40.248
The small lights needed another fabrication task.

00:01:40.406 --> 00:01:42.368
I cut flat aluminum plates and drilled

00:01:42.368 --> 00:01:44.459
their holes, using two plates per light

00:01:44.459 --> 00:01:45.612
to lift the lights.

00:01:45.867 --> 00:01:47.616
I then mounted two small L E

00:01:47.616 --> 00:01:49.975
D lights along the passenger-side extrusion.

00:01:50.156 --> 00:01:52.118
The closer photograph shows the light's own

00:01:52.118 --> 00:01:54.636
mounting bracket, its side fasteners and the

00:01:54.636 --> 00:01:57.494
rail underneath. Those small pieces explain something

00:01:57.494 --> 00:01:59.670
a wide roof photograph cannot show on

00:01:59.670 --> 00:02:01.746
its own. The same work area still

00:02:01.746 --> 00:02:03.666
held tools, loose leads,

00:02:03.666 --> 00:02:05.608
junction boxes and conduit.

00:02:05.672 --> 00:02:07.506
Those details belong to the stage the

00:02:07.506 --> 00:02:09.843
project had reached. The next session moved

00:02:09.843 --> 00:02:11.380
into the camera-bracket work,

00:02:11.422 --> 00:02:14.238
with more extrusion, drilled connections and small

00:02:14.238 --> 00:02:16.937
fastening pieces. The mechanical fitting,

00:02:17.129 --> 00:02:19.561
camera attachment and later cable route each

00:02:19.561 --> 00:02:21.225
had their own sequence within the wider

00:02:21.225 --> 00:02:23.124
roof project. Thanks for watching.

00:02:23.187 --> 00:02:25.398
I'm Steve Smith with Camper Van Freedom.

00:02:25.474 --> 00:02:27.992
My roof-rack takeaway is the fitting order:

00:02:28.077 --> 00:02:30.445
move the crossbeams, add the rails,

00:02:30.594 --> 00:02:32.002
bring the panels up for a trial

00:02:32.002 --> 00:02:34.468
position and work through the light mounts.

00:02:34.628 --> 00:02:37.316
The full guide, original diary photographs and

00:02:37.316 --> 00:02:39.941
related roof-layout pages are linked below.

00:02:40.174 --> 00:02:41.256
Until next time.
