Hi, I'm Steve Smith with Camper Van Freedom. My roof-rack fitting sequence started with a rack already on the van. I moved its crossbeams, added another layer of extrusion, brought two solar panels up for fitting and made plates for the small lights. These steps were part of a twelve-hour roof-work session that also included electrical tasks. The wider project was still in progress. The existing rack was the starting point. The added twenty-twenty extrusion sat above the original rack extrusion, so those were separate layers of the arrangement. A lengthwise photograph shows their relationship across the roof. A close-up gives another kind of information: which corner bracket connects the pieces and where its fasteners sit. My numbered diary steps put moving the crossbeams first. I moved them to suit the solar-panel length, then installed extrusion above the existing rack with corner brackets. The order matters because the new pieces were being fitted to an arrangement already in place. This was a sequence of changes to the rack, rather than a photograph of loose rails laid out independently. I then brought two solar panels onto the roof for fitting. That trial position had its own place in the recorded sequence. The following step was cutting twenty-twenty extrusion to size. I keep the panel fitting separate from later electrical connections, because the diary describes what I was checking and fabricating during this particular stage of the build. The corner connections joined the added extrusion to the rack below. One photograph shows a bracket with a fastener visible on each face. The wider view places that connection among the surrounding rails. Keeping those two views together helps locate a small joint later: one explains the connection itself, and the other explains where it belongs in the roof arrangement. The small lights needed another fabrication task. I cut flat aluminum plates and drilled their holes, using two plates per light to lift the lights. I then mounted two small L E D lights along the passenger-side extrusion. The closer photograph shows the light's own mounting bracket, its side fasteners and the rail underneath. Those small pieces explain something a wide roof photograph cannot show on its own. The same work area still held tools, loose leads, junction boxes and conduit. Those details belong to the stage the project had reached. The next session moved into the camera-bracket work, with more extrusion, drilled connections and small fastening pieces. The mechanical fitting, camera attachment and later cable route each had their own sequence within the wider roof project. Thanks for watching. I'm Steve Smith with Camper Van Freedom. My roof-rack takeaway is the fitting order: move the crossbeams, add the rails, bring the panels up for a trial position and work through the light mounts. The full guide, original diary photographs and related roof-layout pages are linked below. Until next time.